|
|
|
Building Name: |
EMD Serono- existing lab building |
Building Occupant : |
Billerica, MA |
Building Name: |
EMD Serono, Inc. |
Building Size: |
56,700 SF |
Number of Story: |
2 + Basement + Penthouse |
Occupancy/ Function Types: |
Pharmaceutical Lab |
Construction Cost: |
$15,000,000 |
Date of Construction: |
Nov, 1999-March 2002 |
Project Delivery Method: |
Fast-Track |
Primary Project Team |
Owner: |
EMD Serono,Inc |
|
Architect: |
Ellenzweig Associates, Inc. |
|
MEP Engineer: |
Bard, Rao+Athanas Consulting Engineers, LLC |
|
Structural Engineer: |
LeMessurier Consulting Engineers |
|
Landscape Architect: |
John G. Crowe Associates, Inc |
| website | |
Contractor: |
Linbeck/Kennedy & Rossi |
1 Maguire Rd Lexington, MA
|
|
Note:
While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Shiyun Chen. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.
|
|